Question 1

Lattice-boom disassembly has reached an interior section between the boom tip and crane body. The boom is supported only at its foot connection and by the tip section resting on blocking; the pendants are slack. A mechanic proposes driving an interior bottom pin partway out while leaving the top pins in place. Is that pin removal permitted in this support condition?

Show answer & explanation

Correct answer: C - No. Tip support prohibits partial withdrawal of either top or bottom pins in that inboard section.

Question 2

An alley prevents full outrigger extension for a telescoping-boom crane being assembled. Its manufacturer permits the intermediate extension shown on a dedicated load chart. The A/D Director verifies that every planned assembly phase is within that chart's limits, the wheels are unloaded, and the level, ground support, attached floats, and blocking meet the manufacturer's requirements. What disposition is justified by these facts?

Show answer & explanation

Correct answer: A - Use the approved intermediate extension and stay within its chart's limits.

Question 3

An assist crane will carry a 10,800-lb component from a 25-ft radius to a final radius of 37 ft. Its chart lists gross capacities of 19,000 lb at 25 ft, 15,000 lb at 35 ft, and 13,000 lb at 40 ft. The chart directs use of the next greater listed radius and requires deductions for a 600-lb hook block, 200 lb of slings and shackles, and a 900-lb lifting beam; no other deductions apply. For the final placement, the correct capacity assessment is:

Show answer & explanation

Correct answer: D - Within capacity by 500 lb, using the 40-ft chart entry.

Question 4

An employer appoints a foreman who recognizes A/D hazards and has authority to correct them. An experienced crane specialist with demonstrated ability to solve the equipment's assembly problems will assist throughout the operation. The foreman does not independently meet the qualified-person criteria; the specialist has no authority to order site corrections. Under OSHA's A/D supervision rule, this arrangement:

Show answer & explanation

Correct answer: B - Is permitted: the competent person directs with qualified-person assistance.

Question 5

For lattice-boom assembly beside an energized line, the utility confirms a voltage of 115 kV and the employer selects OSHA's Table A option. The assessed paths keep every part of the equipment, load line, load, rigging, and lifting accessories at least 18 ft from the line; nothing passes beneath it. Effective encroachment controls are in place. How does the 18-ft separation compare with the requirement for this plan?

Show answer & explanation

Correct answer: A - It satisfies the 15-ft minimum applicable to this voltage-based plan.

Question 6

A 10,000-lb jib section has its center of gravity midway between two lifting points and is rigged on two equally loaded sling legs. Each leg is 30 degrees above horizontal, and its allowable tension in this arrangement is 8,000 lb. Assume a static, symmetric lift; the lifting points and upper fitting are adequate for the resulting forces. Which leg-tension check is correct?

Show answer & explanation

Correct answer: C - 10,000 lb per leg; exceeds the limit by 2,000 lb.

Question 7

A swing-away jib remains folded alongside a telescoping boom. The manufacturer's procedure requires assist-crane support and a fully installed pivot pin and retainer before opening the transport latch. The assist crane has taken the specified jib load, the connection is verified, and the crew is clear of the swing path. The operators have established the prescribed movement controls. Which action can now advance the erection sequence?

Show answer & explanation

Correct answer: D - Open the transport latch and begin the controlled swing with assist-crane support.

Question 8

A mobile crane has been reassembled with a longer lattice boom. Its annual inspection was completed two months ago, and the operator has finished the current shift inspection. The operator is a competent person but is not qualified to evaluate the new boom configuration. Before the crane makes its first production lift, what additional inspection is required?

Show answer & explanation

Correct answer: B - A qualified-person inspection confirming that the assembled crane meets its configuration criteria.

Question 9

During a tower's post-erection plumb check, a qualified person measures 2.4 inches of horizontal deviation over 150 ft of vertical height. The crane manufacturer specifies a maximum deviation of 1:1,000. Which finding should be recorded?

Show answer & explanation

Correct answer: C - Unacceptable: the applicable maximum deviation is 1.8 inches.

Question 10

During A/D, a mechanic radios, 'Going behind the counterweight; hold all movement.' The operator acknowledges. Their agreed release is the mechanic's 'Clear of the crane' call. Before that call arrives, the signal person requests a small swing. Movement may resume only after:

Show answer & explanation

Correct answer: D - The agreed communication confirming that the mechanic is in a safe position.

That's 10 of 1,030

The full bank has 1,020 more A/D Director questions with explanations.

Continue in the free practice test →

View plans